Sindh Mass Transit Authority (SMTA) Friday, December 5, 2025 - 02:54 PM Go to update notifications

Red Line Bus Project:

Launched on June 08, 2025

Project Background

The execution of Red Line is under financing by ADB. AIIB, GCF & GoS and is the responsibility of TransKarachi. TransKarachi has been legally established by Sindh Mass Transit Authority (SMTA) as the company responsible for the operation and management of the Bus Rapid Transit (BRT) System in Karachi. www.transkarachi.pk

About Coordinator

The details of Red Line Corridor are;

Contractor

Name: Engr. Ahsan Mahmood Title: Chief Project Coordinator Oversees the implementation and management of the Green Line BRT Project.

Case Study

Urban centers across the world have struggled with increasing traffic congestion, pollution, and inefficient public transport systems. To address these challenges, the Red Bus Transit (RBT) system was introduced as a Bus Rapid Transit (BRT) model offering a modern, affordable, and eco-friendly solution to urban mobility. The Red Bus Transit (RBT) system consists of: Dedicated BRT Lanes: Ensuring timely, congestion-free movement. Modern Bus Fleet: Low-floor, air-conditioned, often hybrid or CNG-powered buses. Feeder Systems: Integration with local minibuses or vans to connect outlying areas. Ticketing System: Prepaid cards and digital fare collection systems. Safety Features: Surveillance cameras, station security, and separate pedestrian Key Stakeholders Government Authority Urban Transport Department / Mass Transit Authority Responsible for policy-making, funding, and regulation. Project Coordinator Mr. Asif Khan

Watch the Project

Thanks for Watching

© 2023 SMTA (Sindh Mass Transit Authority) | All Rights Reserved | Logicracks Solutions